gas storage well technic

 

operational principle

 
 

1. The selection of main materials for the gas storage well. The special casing for the TP80CQJ gas storage well is specially designed by the company to meet the requirements of CNG gas-filling station gas storage well in accordance with current national standard GB 50156 - 2002- Codes for the Design and Construction of Automobile Refueling and Refilling Stations and SY/T 6535-2002-High Pressure Gas underground Gas Storage Well.

2. N80 casing is the petroleum casing extensively used for the exploitation of oil and gas field, however, and its application in the gas storage well has no legal basis and no manufacturers at home and abroad can provide the fatigue test data meeting the above standard requirements.

3. The “octagonal backing ring” adopted for the interior sealing of the new well mouth of the gas storage well complies with the structure as stipulated by the above standard. A general test shall be performed after the gas storage well is used for 2 years and a comprehensive test shall be performed after 6 years (stipulated by the standard).

4. The liquid discharge pipe adopts stainless steel compound pipe, which can reliably extend to the bottom of the well, which discharges the liquid completely, with high resistance against pressure and distortion. It is firm, secure and easy for maintenance.

5. Well cementation: compulsory injection process is adopted for the ring empty part between the gas storage well tube and the well wall. The light weight cement slurry is injected to the bottom of the well till it reaches 1 / 2 of the well depth, then insulate at the 1 / 2 depth of the well with packer. Weighted cement slurry is used to cement the section from 1 / 2 of the well depth to the ground, so that the gas storage well is fixed in the earth firmly with certain flexible space at its lower part to be adaptable for the expansion or contraction due to change of pressure and temperature.

6. Corrosion prevention: the inside and outside of the seal head is protected by polyurethane coating. The appearance of the well tube, according to the acid, alkali, salt and other corrosiveness from geological logging during the well-drilling, can be coated with anti-rust paint or polyurethane plus protective belt to prevent corrosion.

 